39ATCH5SEEDPROJECTSCOPE10R0102SABER26APR10.PDF.PDF
Published: 05/08/2010
Description
SCOPE OF WORK Upgrade Fire Alarm System, Bldg 31 XDAT # 10-1128 1. GENERAL DESCRIPTION 1.1. The contractor (Ktr) shall provide all design, labor, materials, and supervision to Upgrade Fire Alarm System, Bldg 31. All work shall comply with SABER speci...
