AMENDMENT3.DOC.DOC
Published: 05/11/2010
Description
Additional information discussed at the site visit. There are two building in which the installation will take place. The High-Bay and the annex connected to it. Five fans will be installed in the High-Bay and one in the annex. The annex is 80’x80â...
