RFC1.DOC.DOC
Published: 05/11/2010
Description
Request for Clarification #1 Question: On the walk through we were instructed to Furr Out the riser but the specification does not address this issue and Bldg 21 was not furred out with plywood at the riser. Is this a requirement to make the stair th...