QUESTIONANDANSWER1.DOC
Published: 05/13/2010
Description
Question: The RFP requires the build of six Engineering Test Units (ETU). Does NASA intend for any of these units to be used for design qualification and verification, or should non-deliverable “flight-like” units be manufactured for that purpose? ...
