1_ADDITIOANAL_PWS_AT_IN_CONTRACTING_(2017)_UPDATED_22_FEB_2017.DOCX
Published: 08/20/2018
Description
Clauses that need to be included in PWS in addition to what is checked on the AT/OPSEC Cover sheet Identification for Contractor personnel For contractors that do not require CAC, but require access to a DoD facility or the installation, the contract...
