FBO_3_ATTACHMENT_1_STATEMENT_OF_WORK.PDF
Published: 08/23/2018
Description
The contract contains one Bid Schedule The major items of work are: 1 Lump Sum 1 AC 2 AC 1 Lump Sum 1 Lump Sum 1 Lump Sum 1 Lump Sum 39 LF 33,400 SF 100 EA 300 EA 40 LBs The estimated price range for this project is between -$ ...