ATTACHMENT_P6_PRIME_COST_SUMMARY.XLS
Published: 09/20/2018
Description
Instructions Instructions Government: A On Footer Tab for the worksheet, insert the RFP number after the colon. B Contractors should be instructed to total their proposals by cost category (e.g. Labor, Material, Travel). These totals will ...
