SAN GABRIEL PARKWAY (CR 274 PHASE II) – US 183A TO CR 270
Published: 11/11/2010
Description
San Gabriel Parkway (CR 274 Phase II) – US 183A to CR 270 Project Summary Project Description: Constructing a new two-lane urban roadway (San Gabriel Pkwy). Major work items include Earthwork, Base, Asphalt Pavement, Drainage Structures, Curb & Gut...
