PRESOLICITATION NOTICE WITH A DRAFT STATEMENT OF WORK
Published: 04/12/2019
Description
DRAFT SOW_NAUM Cove Mesa II Erosion Control.pdf Draft Scope of Work Cove Mesa II Erosion Control and Removal Action April 12, 2019 1. INTRODUCTION This scope of work (SOW) is for the erosion control and removal action at the Mesa I...
