ATTACHMENT_4A_-_TWO-TIERED_STRUCTURE.PDF
Published: 05/09/2019
Description
Front Range Multiple Award Construction Contract (FRMACC) RFP FA251719R5000 Attachment 4a - Two-Tiered Structure The FRMACC will have a two-tiered structure. The two tiers are: 1. TIER 1 Tier 1 will be for projects with an estimated valu...
