N4446619SSN01_DRAFT_SOW.DOCX
Published: 05/15/2019
Description
STATEMENT OF WORK 1.0 INTRODUCTION USS Georgia (SSGN-729) requires emergent chemical (Rydlyme) flushing to remove calcium deposits in sanitary tank #8 and the overboard discharge piping from the aft cam sewage pump to pl-102/103. 2.0 SCOPE Contra...
