J-19_TANK_5A.DOCX
Published: 06/06/2019
Description
TANK 5A 1 REMOVE TANK 5A BLADDER CELL. Note ROUTE BLADDER CELL TO OSV FOR INSP/REPAIR. 2 REMOVE LOWER CENTER, LEFT AND RIGHT TANK 5A FLOOR PANELS,2 EACH FLOOR PANELS ON L/H & R/H SIDES, REMOVE 3 EACH ACCESS PANELS ON L/H & R/H SIDEWALL...
