W911SD-19-R-0138_SOW_REVISON_JUNE_7_BLDG_604_CLEANING_TURBINE_TURBINE_BOILERS.PDF
Published: 06/07/2019
Description
SCOPE OF WORK: PUNCHING OF BOILER TUBES FOR BOILERS # 1, 2 & 3 IN BUILDING 604 ? Opening of the waterside of the boilers (Will be performed by the Plant Personnel) ? Lock out and draining of the boiler (Will be performed by Plant Personnel) ...