QUESTIONS AND ANSWERS
Published: 06/20/2019
Description
1. The requirements for design are unclear. RFI responses and the SOW mention providing as-built drawings, but also call for providing the remainder 20% of design to complete the design. As- builts drawings and design work are different concepts. ...
