P45162_SOW.DOC
Published: 10/23/2019
Description
53150_JSP_0517_753 53150_NJP_1213_418 WORK ITEM 1: Reverse Osmosis, System Groom 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to inspect and groom ship?s Reverse Osmosis Water Purifier Unit listed in the ...
