SCOPE OF WORK
Published: 10/23/2019
Description
P45162_SOW.doc 53150_JSP_0517_753 53150_NJP_1213_418 WORK ITEM 1: Reverse Osmosis, System Groom 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to inspect and groom ship?s Reverse Osmosis Water Purifier...
