SOW (PDF)
Published: 11/06/2019
Description
STATEMENT OF WORK 1A.1 GENERAL: Provide all necessary materials, labor, equipment, tools and supervision to replace the existing gravel surface with a concrete pavement slab in front of the FMP Building at the Chicago TRACON site in El...
