OFFERSCHEDULEFORWELLPUMPREPAIR2.DOCX.DOC
Published: 03/14/2011
Description
Offer Schedule Description Unit Unit Cost Total Cost CLIN 0001- Pull 200’ of column pipe and bowl assembly, tear down and inspect pump. 1 EA CLIN 0002- Replace out of tolerance complete section of column pipe to include line shaft and bearings. 20 ...
