PREAWARD SURVEY OF SUBCONTRACTOR ACCOUNTING SYSTEM (10-29-18).DOC
Published: 12/20/2019
Description
PREAWARD SURVEY OF PROSPECTIVE SUBCONTRACTOR'S ACCOUNTING SYSTEM Subcontractors for Lawrence Berkeley National Laboratory (LBNL) are required to have a cost accounting system that is adequate for the proposed type of subcontract, including distinct s...
