V-22 ATTACH 08 TEI PROCESS DRAFT.DOCX
Published: 02/11/2020
Description
ATTACHMENT (8) DRAFTING AND PROCESSING TEMPORARY ENGINEERING INSTRUCTIONS (TEI) AT CONTRACT MAINTENANCE FACILITIES For V-22 Integrated Maintenance Concept (IMC) Planned Maintenance Interval (PMI) Reference: (a) NAVAIR SWP4300-010 (b) NAVAIR F...
