W25G1V20R0016 ATTACHMENT 2 QASP.DOCX
Published: 02/18/2020
Description
Quality Assurance Surveillance Plan 1.0 SCOPE The purpose of this surveillance plan is to provide Tobyhanna Army Depot (TYAD) Directorate of Contracting with the procedures necessary to monitor the performance of Kitchen Exhaust Hood and Ductw...
