ATTACHMENT 2 - REPAIR TRIANGLE TRACK SPECS.PDF
Published: 02/19/2020
Description
SECTION 32 18 23 ACRYLIC TRACK SURFACING (RED) PART 1 ? GENERAL A. DESCRIPTION 1. The project scope of work consists of the removal of an existing track surface on an asphalt base, the installation of a new track surface. 2. Trackl...
