3 ENVIRONMENTAL REQUIREMENTS.DOCX
Published: 03/02/2020
Description
ATTACHMENT 2: ENVIRONMENTAL REQUIREMENTS 1. Contractor must meet all terms and conditions as stated in the contract. Below is only a partial list of the terms and conditions. The most stringent code should be adhered to. 2. Permits 2.1. Permits, Appl...
