(UPDATE) 7. HAMMERMILL UPGRADE - SITE VISIT Q&A.DOCX
Published: 03/23/2020
Description
Site Visit Questions 5 March 2020 @ 9:00am F1M31A9357A0011 Bldg 166 - Hammermill Upgrade Project Q & A: 1. Analyze and repair if necessary, drainage pipe from dump site to base sewage connection Q: If repairs needed, how long is the drainage pipe/...