2020 RCS CONTRACT PWS ATTACHMENT 1 REVISED 3-2-20.DOCX
Published: 03/24/2020
Description
PWS Attachment 1 COMPREHENSIVE SURVEY PROCEDURES The contractor shall retain an internal SOP to reflect changes made in this attachment. A. Specific Requirements 1. Before commencing a comprehensive survey, the Surveyor shall meet with the Authorized...
