19-0037 BLDG 1 AND BLDG 11 - OSP AND PATHWAY REQUIREMENTS.PDF
Published: 05/18/2020
Description
BLDG 11 OSP CONTRACTOR SHALL CONTACT BASE TELEPHONE PRIOR TO CONSTRUCTION; GOV’T SHALL REMOVE EXISTING OSP CABLING PRIOR TO CONSTRUCTION. INSTALL (1) 4” PATHWAY AND 50 PR COPPER FROM TELECOM ROOM TO RP400-1, ADJACENT TO BLDG 27 (~125’). L...
