BID SCHEDULE (BLANK) YTPM 19-0010.PDF
Published: 05/19/2020
Description
001 Asphalt Parking Lot 54.00 EA 002 Electrical Work & Light Poles 6.00 EA -$ Signature Of Estimator Date Remove top layer of soil, add crush stone, and pave parking lot with area lighting. BID SCHEDULE ...
