UPDATED ATTACHMENT 7 PANEL SCHEDULE BLDG 1.XLS
Published: 06/05/2020
Description
Room 139 LHB PANEL LHB (room 139)-Powered from Switchgear in basement, 480/277v, 225A, 3phase # Amps Location # Amps Location 1 Blank 2 Blank 3 Blank 4 Blank 5 Blank 6 Blank 7 20 Corridor nite lights 8 20 Corridor lites south 9 20 Stair...
