REVISED RH MAINTENANCE FACILITY PEB SPECS.PDF
Published: 06/17/2020
Description
7-1 MALMSTROM AIR FORCE BASE PRE-ENGINEERED BUILDING SPECIFICATIONS / SALIENT CHARACTERISTICS 1. SYNOPSIS ? Contract to design, fabricate, and deliver components for a 20,000 square foot, Pre-Engineered Building (PEB) facility intend...
