RFIS.DOC
Published: 06/18/2020
Description
1. Does the contractor need to provide items involving the WiFi/3G kit which is city requirement on their pads? Response: Wifi kit is required, please refer to page P-102 of the drawings for details. 2. The drawings refer to Vortex features, valves, ...
