CLARIFICATION OF SPECS 12010920Q0082.DOCX
Published: 07/20/2020
Description
Clarification of Specs 12010920Q0082 Change to Part 2-Products 18. H. . All windows are to be replaced by the contractor as specified in this scope of work and specifications below: 1. All windows that are scheduled to be replaced with single hung ...
