SOW ERF PERIMETER AND ECP (17 JUNE 20).PDF
Published: 09/01/2020
Description
STATEMENT OF WORK FOR Construct ERF Entry Control Point and Perimeter Wall 17 June 2020 1. Description of Requirement. The contractor shall provide all personnel, equipment, tools, supervision, other items and incidentals necessary to desig...
