DESIGN REVIEW COMPLETION SCHEDULE 632-16-103 AND 631-21-114.DOCX
Published: 12/07/2020
Description
632-16-103 Replace Roof and Repair Fa?ade Bldg. 62, 63 632-21-114 Replace Roof and Repair Fa?ade Bldg. 12 SP-13 DESIGN REVIEW AND COMPLETION SCHEDULE (a) The A/E shall perform the work required by this contract in compliance with the followin...
