Q&A, 04/14/99
Description
Questions and Answers (RFP Dated 6 Apr 99) 1. Reference RFP Page 62 of 72, Section 5, and Paragraph 2.3 (Subcontractor Rates). Instructions state that “This sheet should be filled out in the same manner as the Prime Rates sheet, with the exception ...
