RF180 FLUOROSCOPY RFI AND ANSWERS.DOCX
Published: 04/15/2021
Description
Fluoroscopy RFIs 1. Reference Drawing 2 of 16 Customer Responsibilities paragraph 2: Please confirm a structural engineer has ensured that the existing floor and ceiling are designed to carry the loads of the new equipment. The new RF180 is lighter ...
