APPENDIX V - FLOWABLE FILL MATERIAL
Published: 04/16/2021
Description
Appendix V Rapid Setting Flowable Fill 1. General. a. The Engineering Research and Development Center (ERDC), Vicksburg, MS, is the Department of Defense?s lead pavements research facility for roadways, permanent airfields, contingency airf...
