DRAWINGS.DOCX
Published: 07/09/2021
Description
Installation Photos- Location of one of the 8 ton condenser units Location of the second 8 ton condenser unit 6 inch core drill location Routing of line sets, provide a PVC sleeve through the GWB wall Line set routing at ASDE Penthouse level...
