20THRSPWSREVISED6SEP11.DOCX
Published: 09/08/2011
Description
Performance Work Statement (PWS) Alarm & Camera Installation for 20th RS 6 September 2011 1.0 Scope This PWS defines the effort required by the contractor for the installation of a Vindicator alarm system and VICADS camera network for the 20th Recon...
