QUESTIONS2.DOCX
Published: 09/08/2011
Description
Questions 2 8 Sep 2011 1. Reference: 1.1.3. Special Events. In addition to the scheduled refuse collections, the CO may require the Contractor to make unscheduled collections and disposals. For unscheduled events, the Contractor shall respond within ...
