329223SODDING.DOC
Published: 09/09/2011
Description
32 92 23 – SODDING GENERAL SCOPE The contractor shall provide all plant, labor, materials and equipment and incidentals necessary to complete the work. RELATED WORK Prepare subgrade to receive topsoil. Place, rake and level topsoil as required to p...
