SECTION208EXCAVATIONBACKFILL.DOCX
Published: 09/10/2011
Description
Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES Description 208.01 This work consists of excavating material for the construction of selected structures. The work includes preserving channels, shoring and bracing, con...
