ATCH4CONTRACTORBIDSCHEDULEFOR9MONTHS.PDF
Published: 09/12/2011
Description
WORK ITEM ESTIMATED UNIT QUANTITY Removal for Roads and Airfields: A 001 Remove Existing Asphalt to On-Base / On-Post Site 5,000 TONS A 002 Remove Existing Asphalt to Off-Base / Off-Post Site 250 TONS A 003 Remove Existing Asphalt [< 2,500 Tons] 4,0...
