ATCH12SECT02521RUBBERANDPAINTREMOVALONAFLDPAVTS.DOCX
Published: 10/06/2011
Description
DIVISION 2 - SITEWORK SECTION 02521 - RUBBER AND PAINT REMOVAL ON AIRFIELD PAVEMENTS AT ALTUS AFB PART 1 - GENERAL 1.1 SCOPE: A. The work consists of furnishing all labor, equipment, materials required to remove 85 percent of the rubber and/or 95 per...
