BLDG 4 INSPECTION REPORT.PDF
Published: 04/05/2022
Description
Location Date Structure Time Inspector Corrective Action Required Yes No Narrative Inspection Report Bldg.4 2/14/2022 x Jeff Roberts Sizes and footage of duct to be cleaned Supply Air 40 ft. of 6" 26 ft. of 8" 208 ft. of 10" 260 ft. of 12" ...
