S02_ATTACHMENT 5_IFB CONTRACTOR COST ESTIMATE WORKSHEET.XLSX
Published: 04/06/2022
Description
Sheet1 This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. If a Divis...
