1 1-141 IN AT MEALS_31JUL_13AUG22_PWS_PRS_CATEREDRATIONS.PDF
Published: 05/03/2022
Description
PERFORMANCE WORK STATEMENT (PWS) FOR Catered Meal Services 1.0 General: 1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Go...
