SOW DECISIVE STEAM PIPING (002).DOCX
Published: 05/04/2022
Description
S_53500_PpngRnwl_SWIT_SLE_0121_SWIT S20_0040_53500_PpngRnwl_SWIT_CJ_0821_629 WORK ITEM 1: Steam System Piping, Renew 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to renew designated steam piping, located in the G...