60613250_WIANG_TRUAX-MED-E_V19 - SHEET - E-601 - ELECTRICAL SCHEDULES
Published: 06/21/2022
Description
NOTES: 1. THE CONTRACTOR SHALL PROVIDE THE LIGHT FIXTURES WITH THE MOUNTING METHOD REQUIRED FOR THE CEILING SYSTEM SET FORTH ON THE ARCHITECTURAL DRAWINGS, SUCH AS, THE REFLECTED CEILING PLANS, AND ROOM FINISH SCHEDULE, ETC. 2. THE ACTUAL APERTURE...
