RFP CONTRACTOR COST ESTIMATE WORKSHEET FOR FORT HARRISON NATL CEM.XLSX
Published: 08/16/2022
Description
Sheet1 This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. If a Divis...