ADDENDA-INSTRUCTIONS-EVALATION CRITERIA-BASIS FOR AWARD.PDF
Published: 08/24/2022
Description
Instructions and Evaluation Criteria, and Basis for Award NB687080-22-01740 A. INSTRUCTIONS: 1. The Contractor shall submit their quotation on letterhead to the email address stated herein by the date and time specified herein. The quotation sha...
